No new pics today. Things look pretty much the same inside. The drywall mud is drying, hoping they can sand it on Thursday. Trim will be installed on Friday. The painters will prime the walls/ceilings on Saturday. The siding crew is working on the 3rd side of the house. The front of the house will be the last, and hopefully the quickest, since it's so narrow and some of it will be stone, in lieu of siding. We're waiting for the grinder pump to be installed, as well as one or two other underground utlilites. Once that happens, we can really work on the "yard" and figure out how many loads of dirt/top soil we'll need. We hope to have our driveways poured the end of next week. We're so close, yet so far away...