Yesterday, the floor trusses were installed. Essentially they divide the basement ceiling from the first floor floors, if that makes sense. In the trusses, we will run duct work and electrical wires.
1st PHOTO: View of the house from the street. The top of the trusses are about level/even with the street.
2nd PHOTO: View from the front of the unfinished portion basement, looking to the back.
3rd PHOTO: View from the back of the garage basement, looking to the front.
We passed the open floor inspection this morning, so the framers are there now laying the sub-floor for the 1st floor. We are waiting on temporary stairs - leading from the basement to the soon to be 1st floor. The concrete guys are there as well today putting in the remaining footers needed for the screened porch and the grille deck. Tomorrow, the grading crew is coming to back fill and do a rough grade of the lot. The lot should look a lot different tomorrow evening!!
Labels:
basement,
floor trusses
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment